Skyline Enterprises has pumped S$14 million (US$10.3 million) into its Skyline Luge attraction in Sentosa, adding two new Luge tracks and a new Skyride.
At the Imbiah Station starting point, riders can choose from a variety of tracks including the new 658m-long Expedition and 638m-long Kupu Kupu (“Butterfly” in Malay) trails, on top of the existing 628m-long Jungle Trail and 688m-long Dragon Trail. All four tracks total a length of 2.6km.
Another addition is Skyride, which spans 315 metres, offering views of Sentosa, the Singapore city skyline and South China sea on a four-seat chairlift.
These enhancements are expected to decrease waiting times for the rides, said Danny Luke, general manager, International Luge.
Since its opening in 2005, Skyline Luge Sentosa has hosted more than 13 million rides.
At the Imbiah Station starting point, riders can choose from a variety of tracks including the new 658m-long Expedition and 638m-long Kupu Kupu (“Butterfly” in Malay) trails, on top of the existing 628m-long Jungle Trail and 688m-long Dragon Trail. All four tracks total a length of 2.6km.
Another addition is Skyride, which spans 315 metres, offering views of Sentosa, the Singapore city skyline and South China sea on a four-seat chairlift.
These enhancements are expected to decrease waiting times for the rides, said Danny Luke, general manager, International Luge.
Since its opening in 2005, Skyline Luge Sentosa has hosted more than 13 million rides.